Projects

See how WYN Services Group applies decentralized wastewater expertise in the field. These projects highlight real-world construction, installation, and problem-solving work that supports reliable long-term system performance.

Tank Pour Preparation

Tank Pour Preparation

Site preparation for this 42,000 gallon septic tank involved excavation, forming, and water control.

Tank Pour Preparation

42,000 Gallon Wastewater Tank Pour

This three-compartment septic tank has two interior walls to promote settling of solids.

Tank Pour Preparation

ARAP Creek Crossing

Crossing waterways while running pipelines involves understanding Aquatic Resource Alteration Permit regulatory and technical requirements.

Tank Pour Preparation

Controls and Quad Pump Installation

WYN Services Group installed these four pumps and a control panel to move water to the treatment plant.

Tank Pour Preparation

Pipeline Road Crossing

This road crossing involved open-cutting a road to run two sleeves underneath for the pipelines.

Tank Pour Preparation

Wastewater Pipeline Pipe Laying

Green PVC pipe is used for untreated "gray water" and purple PVC pipe is used for moving treated effluent for beneficial reuse purposes.

Have a wastewater project to plan or support?

Talk with WYN Services Group about construction, system upgrades, maintenance, and problem-solving support.